|
Production
pictorial of a 264-Xeon Linux Beowulf cluster system for US Dept of
Energy.
High performance technical
computing cluster / grid hardware / software integration services
rendered cost-effectively for a Beowulf Linux Cluster with Infiniband
and Ethernet interconnect / interconnectivity fabric options. No
Myrinet, Dolphin, or Quadrics.
back
< >
forward
Series
1:
62,000-sf
system integration/staging facility near Boston, Massachusetts
|